No.24Collaboration · revision
Grade 9 · Term 3
An interactive companion to the Grade 9 General Term 3 revision booklet, built for independent practice. Revision booklet authored by Ms Pratha Kulshreshtha; turned into an interactive and gamified student experience by Mourad Mekki.
- Audience
- Grade 9 General · Term 3
- Availability
- Live · Term 3, 2025–2026
- Chapter
- VII · Built with colleagues
- Built with
- Pratha Kulshreshtha — Author of the revision booklet

The classroom problem
A carefully prepared revision booklet carries a teacher's classroom expertise into structured form — its reach naturally ends where lesson time and the printed page end. The opportunity was to extend Ms Pratha Kulshreshtha's authored content into an interactive second home, where Grade 9 students could keep engaging with the same material in a more guided, active way between lessons.
The response
Ms Pratha Kulshreshtha's revision booklet was redesigned by Mourad Mekki as a clean five-module interactive — vocabulary flashcards and games, grammar lessons with practice modes, sentence-building drills, reading with timed comprehension, and writing tasks with smart feedback. The academic content is preserved in full; the interactivity and gamified layer is the design contribution.
Inside the product
Students and teachers
What students can do
- Eleven themed vocabulary units across three levels
- Thirteen grammar lessons with practice and challenge
- Six guided writing tasks with smart feedback
- Gamified progress and practice rounds for motivation
What teachers can do
- Achievement tracking per student
- Student report dashboard
- Print or PDF for non-digital lessons
- Preserves the booklet's academic value while extending its classroom reach
Curriculum, print and privacy
- Curriculum
- UAE MoE · Grade 9 General CCG · Term 3 · 2025–2026 · Booklet authored by Ms Pratha Kulshreshtha · Interactive platform by Mourad Mekki
Evidence
On interactive learning & collaboration
I have accessed and used the amazing interactive work created by Mr. Mourad. The interactive approach enhances engagement and makes learning more relevant for Gen Z students. It also helps scaffold learning for weaker students and enables them to learn at their own pace.
It was a pleasure to collaborate with him on another Grade 9 website. His humility and ever-willing nature have inspired many of us to become adventurers and go beyond for our students.
English Teacher, Al Bridi Secondary School for Girls, Sharjah
- Classroom use
- Used during Term 3 revision lessons and as guided homework.
- Measured outcomes
- No measured attainment data is published for this platform. Descriptions above cover what the product does, not proven results.
- Verification
- Checked live, 9 October 2026 (Term 3, 2025–2026 content).



